Sign up for the newsletter

Sign up for the Stellantis Communications Newsletter and stay updated on all the news.

12 Dec 2022

Stellantis to supply all-electric vehicle production at Ellesmere Port with new maritime logistics service

New maritime shipping route to supply Ellesmere Port plant with parts will take 14,700 lorry journeys annually off Europe’s roads Annual CO2 emissions reduced by 30% and energy consumption reduced by 37% compared to road travel Stellantis has partnered with Suardíaz to provide the end-to-end logistical service Peel Ports to provide a 9.4-acre site at Queen Elizabeth II Eastham dock – located just two miles from the Ellesmere Port plant Production of all-electric compact van to start in Spring 2023 after a £100million transformation of the Ellesmere Port plant

Stellantis to supply all-electric vehicle production at Ellesmere Port with new maritime logistics service
  • New maritime shipping route to supply Ellesmere Port plant with parts will take 14,700 lorry journeys annually off Europe’s roads
  • Annual CO2 emissions reduced by 30% and energy consumption reduced by 37% compared to road travel
  • Stellantis has partnered with Suardíaz to provide the end-to-end logistical service
  • Peel Ports to provide a 9.4-acre site at Queen Elizabeth II Eastham dock – located just two miles from the Ellesmere Port plant
  • Production of all-electric compact van to start in Spring 2023 after a £100million transformation of the Ellesmere Port plant

ELLESMERE PORT, Dec. 12, 2022 – Stellantis is launching a new maritime logistics service, in partnership with Suardíaz and Peel Ports, in order to supply parts to our Ellesmere Port manufacturing plant and reduce carbon emissions in line with our Dare Forward 2030 Strategic Plan.

The Ellesmere Port plant is currently undergoing a major transformation to manufacture a compact electric van (Vauxhall/Opel Combo Electric, Peugeot e-Partner and Citroën e-Berlingo) from Spring 2023.

A number of the sheet metal parts and components required for production will be supplied from partner companies that are based near the Vigo plant in Spain – the other Stellantis plant that manufactures these electric light commercial vehicles.

In order to improve the supply chain flows to Ellesmere Port, a new end-to-end logistical service is being put in place, operated by Suardíaz.  This will include a new twice weekly shipping service from Vigo Port to Queen Elizabeth II Eastham docks, Merseyside. 

Starting from June 2023, after the initial production ramp-up, the new 891 nautical miles maritime route will take an estimated 14,700 lorry journeys off the roads of the UK and continental Europe annually saving around 17.5 million kilometres (c.11 million miles) of road travel. 

Each ship will be able to take up to 95 lorries whose cargo will comprise around 47 different part lines of sheet metal parts and components that will be used in the assembly of the all-electric compact vans.  The packaging used to transport the parts is then taken back to Vigo Port on the return leg in order to be reused for subsequent trips.  The journey time from Vigo Port to Queen Elizabeth II Eastham docks is around 50 hours – a comparable time to the current road journey. 

Compared to road transport, the direct maritime route has 30% lower CO2 emissions over the course of a full year as well as 37% less energy consumption.    

Suardíaz will manage the end-to-end logistical service from one plant to another.  Peel Ports will provide a 9.4-acre site at the Queen Elizabeth II Eastham dock in order to enable this new maritime route. 

Peel Ports and Suardíaz have invested a combined £10million in recommissioning a berth at the Queen Elizabeth II Eastham dock and installing the infrastructure needed to support the processing of the Roll-on Roll-off (RoRo) ships and their cargo. 

The dock is conveniently located two miles from the Stellantis Ellesmere Port plant with direct access to the River Mersey and the Manchester Ship Canal. 

Paul Willcox, Senior Vice-President, UK Country Manager, Stellantis:

“With Ellesmere Port set to soon reopen manufacturing all-electric light commercial vehicles, we are looking at all aspects of our value chain in order to improve sustainability and efficiency, in line with our Dare Forward 2030 Strategic Plan.

I’d like to thank our partners at Suardíaz and Peel Ports for their collaboration on this new maritime logistical supply route that will enable us to ensure increased efficiency of service to the plant whilst removing congestion and emissions from Europe’s roads.”

Juan Riva, President of Suardíaz:

“We assume responsibility for the logistics connection between the Stellantis facilities in Vigo and Ellesmere Port, and we use maritime transport with an efficient and environmentally friendly solution. By avoiding trucks on the road and with the forthcoming addition of biofuels to our ships, we are contributing to sustainability in the same spirit under which Stellantis electric vehicles are manufactured.”

David Huck, Chief Operating Officer at Peel Ports Group:

“We are delighted to be part of this exciting project, enabling Stellantis’ vision to develop a more sustainable and efficient supply chain for this important North West manufacturing base.

Our co-investment of £10m into QEII Eastham Dock with Suardíaz will create a new Green Automotive Hub for Ellesmere Port which will increase efficiency while reducing road congestion and carbon emissions. We are fully committed to continuing to invest in sustainable projects of this nature to support our supply chain customers and partners.”

 

# # #

About Stellantis

Stellantis N.V. (NYSE / MTA / Euronext Paris: STLA) is one of the world’s leading automakers and a mobility provider. Its storied and iconic brands embody the passion of their visionary founders and today’s customers in their innovative products and services, including Abarth, Alfa Romeo, Chrysler, Citroën, Dodge, DS Automobiles, Fiat, Jeep®, Lancia, Maserati, Opel, Peugeot, Ram, Vauxhall, Free2move and Leasys. Powered by our diversity, we lead the way the world moves – aspiring to become the greatest sustainable mobility tech company, not the biggest, while creating added value for all stakeholders as well as the communities in which it operates. For more information, visit www.stellantis.com.

@Stellantis

Stellantis

Stellantis

Stellantis

 

About Suardíaz

Suardíaz is a logistics group with more than 70 years of experience, including companies dedicated to shipping, rail and truck operator, terminals, forwarding, customs, warehousing and special projects.  We have operated the ‘Motorway of the Sea’ between Vigo and St Nazaire (and the 2 terminals) that supply the parts to the Vigo factory since its inception.  We operate several RoRo and Car Carrier services between West Med, North Africa and North Europe, and are expanding to the UK.  We have offices in Spain, France, Morocco, Mexico and Colombia, and soon in the UK.

 

About Peel Ports Group

Peel Ports Group is one the UK’s largest port operators, owning and operating six of the UK’s most important ports (Liverpool, Heysham, Manchester Ship Canal, Medway (Sheerness / Chatham), Clydeport and Great Yarmouth). It also operates a container terminal in Dublin and owns BG Freight Line, which provides short sea container services between the UK, Ireland and mainland Europe and Peel Ports Logistics, one of the UK’s leading shipping and freight forwarders.  

 

Peel Ports handles approximately 70 million tonnes of cargo every year. 14% of the total UK major ports traffic flows through ports operated by the Group. Headquartered in Liverpool, it employs around 2,000 staff, and had an EBITDA of £271.9m for year ended 31 March 2021. 

 

www.peelports.com 

 

For more information, please contact:

Jeremy Townsend, Stellantis Communications Director

Tel:  +44 (0)7827 896480 Email:  jeremy.townsend@stellantis.com

Matthew Bendall, Head of Vauxhall PR 

Tel:  +44 (0)7920 163854 Email:  matthew.bendall@vauxhall.co.uk