21 Jul 2014

Fiat engines and transmissions plant in Betim is the first in Latin America to achieve Silver level in WCM

The engines and transmissions plant of Fiat Automóveis in Betim, Minas Gerais, have just taken its rating in the World Class Manufacturing (WCM) system from bronze to silver. "This is the first plant of the Fiat Chrysler group in Latin America to reach this level. The new category is recognition of the continuous improvement process of the organization in the workplace, quality, maintenance and logistics of Betim plant, which is in the process of full modernization and technological upgrading", says Alfredo Leggero, Director of Manufacturing for Fiat Chrysler Latin America.

Fiat powertrain plant produces 700,000 Fire 1.0 and 1.4 engines annually and 600,000 C510 and C513 transmissions.

WCM since 2006

The World Class Manufacturing (WCM) is the overall production system adopted by the Fiat Chrysler Group, based on the best and most advanced manufacturing concepts. The WCM emerged in 2006 through the cooperation of world experts in Lean Manufacturing and is based on 20 pillars, being 10 technical and 10 managerial. The system aims to improve the production mode to achieve the standards of excellence and covers all main technical production systems: organization of workplace, quality system, maintenance and logistics system. The goal is to avoid and eliminate losses and waste having safety as essential item in all activities.

“During the process of development of a world class manufacturing, besides the transversal application of methods and tools, we established a strong involvement and development of people", says Leggero. "In a reality as of Betim, people are the force factor of the entire production system. In 2013 only, more than 2,000 projects were improved and tens of thousands of suggestions were generated. The effort is focused on the constant increase of the technical, managerial, operational and methodological skills, enhancing leadership skills, developing talents and showing results", adds.

The audit

From July 16 to 18, the plants of Engines & Transmissions in Betim had a WCM audit conducted by Emanuele Lorenzin, who was director responsible for the Fiat factory in Bielsko Biala (Poland), and is the current Director of Planning and Control of Manufacturing of EMEA (Europe, Middle East and Africa), and Ennio D'Antonio, current director of the plant in Mirafiori (Italy), with the special participation of Luciano Massone (global WCM of Fiat Chrysler group). The factory reached 61 points and became the first unit of the group in Latin America to receive the Silver certification. During the audit, there was evaluated the application of methods and tools of WCM, both on the technical and managerial pillars, besides the results achieved with its application in the production process of engine and transmissions.
The Silver certification states that the certified plant developed knowledge about the methodology, applied and developed the best world practices and, overall, expanded the knowledge base created for its production process.